Accident Emergency Response For Tower Cranes
May 13, 2024
Leave a message
(1) Tower crane foundation sinking or tilting: ① Stop operation immediately and lock the slewing mechanism to limit its rotation. ② Set ground anchors according to the situation to control the tilt of the tower crane.
(2) Tower crane balance arm or boom folding: ① The tower crane cannot make any movement. ② According to the emergency plan, use welding and other means according to the situation to reinforce the tower crane structure, or use connection methods to connect the tower crane structure with other objects to prevent the tower crane from tipping over and accidents during the demolition process. ③ Use 2-3 cranes of appropriate tonnage, one to lock the boom and one to lock the balance arm. One of them plays a balancing torque role when dismantling the boom to prevent tipping due to sudden changes in force. ④ Remove the deformed connectors in the boom or balance arm connectors in the order specified in the emergency plan, cut them open with gas welding, and remove the arm rod with a crane. ⑤ Dismantle the tower crane according to the normal tower dismantling procedure, and cut the deformed structure with gas welding.
(3) Overturning of the tower crane: ① Use welding and connection methods to increase the balancing torque without destroying the instability force and control the development of the danger. ② Select a crane of appropriate tonnage to dismantle the tower crane according to the rescue plan, and cut or adjust the deformed parts with gas welding.
(4) Danger of the anchoring system: ① Align the tower balance arm to the building, and the arm rotation process should be smooth and locked. ② Strengthen the tower crane anchoring system. ③ If it is necessary to replace the anchoring system components, first lower the tower crane to the specified height and then replace the components.
(5) Deformation, fracture, and open welding of the tower structure: ① Align the tower balance arm to the deformed part, and the arm rotation process should be smooth and locked. ② Use welding and other means according to the situation to reinforce the deformed, fractured, and open welding parts of the tower crane structure. ③ Drop the tower and replace the damaged structure.