Flat Head Tower Crane ZJT6013

Flat Head Tower Crane ZJT6013

Max. hoisting capacity : 8t
Max. boom length : 60m
Max. hoisting capacity at jib end :1.3t
Max. free standing height : 42m
Send Inquiry

Description

Technical Parameters

Flat-top tower cranes do not have the "top" of a traditional crane; they can be used in combination with other tower cranes in locations where space is limited or near airports. The most versatile tower crane solution for all types of construction sites. Flat-top cranes are quick and easy to assemble and maximize the use of available space. These cranes stand out for their optimized component weight, allowing them to be assembled quickly and easily in congested areas.

ZJT6013 flat top tower crane has strong performance in lightweight product. Adopting stronger tower section with better structural stability. It can adapt to more complex working environment. It's very popular among customers. Max. boom length 60m, free standing height 42m, max. hoisting capacity 8t, tip load is 1.3t.

 

Mechanism Specification

 

 

Hoisting

1

Fall

2

3

Load capacity (t)

1

2.5

4

2

5

8

Speed (m/min)

80.1

52.2

34.8

20.9

4.2

40.1

26.1

17.4

10.5

2.1

Power (kW)

30

Slewing

2

Speed (r/min)

0-0.6

Power (kW)

2×4

Trolleying

3

Speed (m/min)

0-54

Power (kW)

4

Climbing

4

Speed (m/min)

0.7

Power (kW)

7.5

Pressure (Mpa)

28

Total power (kW)

42(Not include Climbing mechanism motor)

1(t)

37.2

1Weight: the weight of underground section without load and ballast with longest jib and maximum free-standing height.

Steps to Efficiently Install a ZJT6013 Flat Tower Crane

 

1. Determine the location of the on-site tower crane.

We will evaluate the site drawings and make recommendations on the best location for the tower crane. The location chosen will maximize the crane's working potential while also taking into account the crane's installation and disassembly requirements.

2. Prepare the crane base.

The floor of the crane base must be level and suitable to support the weight of the crane. Foundation preparation begins weeks before the crane is installed, as the ground may need to be compacted, a concrete foundation constructed, and the foundation may need to be reinforced with piles.

ZJT7022001

 

There are ten situations in which flat-top tower cranes cannot be used:

 

1. Inclined suspension; 2. Overloading; 3. Bulk cargo is too full or; 4. Bales are loose; 5. It is strictly prohibited to stand on the hanger; 6. The command signal is unclear; 7. Components are buried underground; 8. Bypassing Safety devices; 9. When the lights are dim and accidents are likely to occur; 10. There are strong winds above Level 6.

 

Hot Tags: flat head tower crane zjt6013, China flat head tower crane zjt6013 manufacturers, suppliers, factory, self erecting crane, crane control system, small crane, crane accessories, large crane, luffing crane

Send Inquiry