6t Construction Crane

6t Construction Crane

Max. hoisting capacity : 6t
Max. boom length :57 m
Max. hoisting capacity at jib end :1t
Max. free standing height : 42m
Send Inquiry

Description

Technical Parameters

Construction industry cranes is a machine that is equipped with sheaves and cables that can lift or lower heavy objects or materials. These giant machines can often be seen in cities, rising hundreds of metre in the air to construct huge skyscrapers. Topless tower cranes remain in one place while working and are not designed to move.

 

Tower cranes are among the largest and most useful pieces of heavy equipment, and the importance of their maintenance cannot be underestimated. Because the repair costs and prices of new tower cranes are extremely high, modern construction companies focus on efficient execution of crane maintenance procedures. Careful operation and high maintenance standards are the main criteria driving tower cranes to exceed expected operating times.

 

Mechanism specification

 

 

Hoisting

product-47-88

 

Fall

product-67-76

product-39-41

 

Load capacity (t)

1

1.5

3

2

3

6

 

Speed (m/min)

100

80

40

20

5

50

40

20

10

2.5

 

Power (kW)

25

Slewing

 product-67-41

 

 

Speed (r/min)

0-0.6

 

Power (kW))

2×4

Trolleying

product-38-15

 

 

Speed (m/min)

0-54

 

Power (kW)

4

Climbing

product-18-30

 

 

Speed (m/min)

0.6

 

Power (kW)

5.5

 

Pressure (Mpa)

20

Total power (kW)

37

(not include Climbing mechanism motor)

product-24-17(t)

35.2

 

product-24-17Weight: the weight of underground section without load and ballast with longest jib and maximum free-standing height.

 

Tower Crane Maintenance Requirements

 

Routine maintenance

Routine inspections focus on visually inspecting tower cranes for obvious signs of damage. Afterwards, the operator checks the hydraulic oil, base oil level and gear lubrication.

Weekly maintenance

Weekly maintenance focuses on cleaning accessible parts to minimize the effects of dirt, dust, debris and other contaminants. A clean tower crane can more accurately handle the material being lifted, while the motor and engine can burn fuel more efficiently.

 

Monthly maintenance

For complex machines like tower cranes, monthly maintenance procedures require skilled technicians and electricians to inspect control panels and internal components and identify electrical hazards. Any damage to even the smallest equipment parts is recorded, while preventive maintenance programs focus on introducing replacement parts in advance.

5

 

Hot Tags: 6t construction crane, China 6t construction crane manufacturers, suppliers, factory, crane trader directory, crane service, crane industry, high capacity crane, crane innovation award, self erecting crane

Send Inquiry