Pointed Tower Crane
Max. boom length :61m
Max. hoisting capacity at jib end :1.3t
Max. free standing height :40.5m
Description
Technical Parameters
Our top-kit tower crane are especially suited for all kind of constructions sites. and has been rated as a "Product Quality User Satisfaction and After Sales Service User Satisfaction" enterprise by the User Committee of the China Quality Association for more than 30 years. Our main production includes all flat top tower crane and topkit tower crane.
Mechanism Specification
|
Hoisting
|
Fall |
|
|
||||
|
Load capacity (t) |
1.5 |
3 |
3 |
3 |
6 |
6 |
|
|
Speed (m/min) |
78 |
40 |
8.5 |
39 |
20 |
4.3 |
|
|
Power (kW) |
24/24/5.4 |
||||||
|
Slewing
|
Speed (r/min) |
0.6 |
|||||
|
Power (kW) |
2×3.7 |
||||||
|
Trolleying
|
Speed (m/min) |
40/20 |
|||||
|
Power (kW) |
3.3/2.2 |
||||||
|
Climbing
|
Speed (m/min) |
0.7 |
|||||
|
Power (kW) |
7.5 |
||||||
|
Pressure (Mpa) |
28 |
||||||
|
Total power (kW) |
34.7 (not include Climbing mechanism motor) |
||||||
|
|
35.2 |
||||||
Weight: the weight of underground section without load and ballast with longest jib and maximum free-standing height.
The machine is composed of steel structure, driving mechanism, hydraulic lifting, electrical control, and safety protection devices.
The steel structure mainly includes: tower body, boom, climbing frame, tower top, balance arm, upper and lower supports, boom pull rods, balance arm pull rods, and attachment devices.
The tower body is divided into two types according to different standard section heights. One standard section has a height of 3m, and the other standard section has a height of 2.8 meters, equipped with different racks. The basic section is divided into two types according to the different forms of the foundation. When users choose a flange foundation, the bottom of the basic section is configured in the form of a flange plate; When selecting the support form, cross shaped frame, or underground section, the bottom of the foundation section should be configured as a connecting sleeve form.

The climbing frame mainly consists of a frame, a platform, a hydraulic lifting device, and a standard section introduction device. The climbing frame is installed on the outside of the tower body, and the upper end is connected to the lower support with a pin shaft. It is a frame structure composed of welded steel and steel plates. In order to meet the safety requirements of jacking installation, a work platform is specially designed.
Hot Tags: pointed tower crane, China pointed tower crane manufacturers, suppliers, factory, tower crane performance, flat top tower crane, self erecting tower crane, tower crane engineering, tower crane components, tower crane lifting equipment
Previous
10 Ton Topkit Tower CraneSend Inquiry