Introduction to precautions for tower crane operations
May 12, 2024
Leave a message
1. Make a reasonable operation plan
Before operating a tower crane, make sure to make a detailed operation plan, including the location, height, and operating range of the crane. Evaluate factors such as wind force and load according to the specific situation, and operate strictly in accordance with the operation plan.
2. Stable foundation and firm support
Ensure that the foundation of the tower crane is stable and firm, follow the construction design requirements, and ensure that the support pads are used correctly. When operating on a weak foundation, measures may need to be taken to increase the bearing capacity of the foundation.
3. Perform equipment inspection
Before each operation, check whether the various functions and safety devices of the tower crane are working properly, including the hydraulic system, crane wire rope, walking mechanism, etc. If any abnormality or failure is found, it should be reported immediately and repaired or replaced.
4. Prevent overload operation
Strictly follow the rated load and restrictions of the tower crane, do not overload the operation, and ensure that the crane and its supporting structure are not damaged or destroyed.

