Building Tower Crane

Building Tower Crane

Max. hoisting capacity: 8t
Max. boom length: 61m
Max. hoisting capacity at jib end: 1.3t
Max. free standing height: 40.5m
Send Inquiry

Description

Technical Parameters

Zhejiang Construction Engineering Machinery Co., Ltd. is one of the most reliable manufacturers and suppliers of building tower crane in China. With abundant experience, we warmly welcome you to buy advanced building tower crane made in China here from our factory. Good service and quality products are available.

 

Products Description

 

ZJCM has become a professional enterprise integrating design, manufacture, sales, installation, repair and services for construction machinery products, such as building tower crane and construction hoist and so on. We have max capactity 6t to 20t tower crane for you choose.

Building tower crane adopts a variety of advanced technologies, with stable operation and reliable management. The 10-ton tower crane is equipped with a variety of devices, such as hydraulic self-propelled devices, variable frequency slewing devices, and a series of reliable safety devices, such as lifting height limiters, slewing range limiters and multi-function limiters.

 

How to Operate a Construction Crane?

 

A crane operator's day begins with proper safety checks. Failure to do so can result in fatal consequences. Before starting work, the operator must:

1. Make sure they are using the correct crane for the job

Construction cranes are not a one-size-fits-all lifting tool. The features it must have depend entirely on the project that requires the crane. It is not uncommon to see several different types of cranes on the same construction site. While their main purpose is to help move heavy materials and equipment, they can be used for so much more.

2. Perform pre-start checks

Ensuring optimal crane operation is a critical step that cannot be ignored. The operator must always check the oil level, seat belts, pressure gauge and battery performance before starting the engine.

For proper communication with the construction team, turn signals, horns, suspension and control systems should be in good working order.

3. Understand construction site procedures

Crane operators are responsible for following certain rules to ensure safety. They can ensure safe lifting by communicating via radio and paying attention to other workers' hand signals to avoid potential hazards. It is critical to keep track of all information provided by control systems.

Mechanics should be proficient in using the joysticks and other controls within the cab to perform all operations correctly. Monitoring load and wind speed is critical.

 

Mechanism specification

 

Hoisting

image002

Fall

image004

image006

Load capacity (t)

1

2.5

4

4

4

2

5

8

8

8

Speed (m/min)

80.1

52.2

34.8

20.9

4.2

40.1

26.1

17.4

10.5

2.1

Power (kW)

30

Slewing

image008

Speed (r/min)

0.6

Power (kW)

2×3.7

Trolleying

image010

Speed (m/min)

40/20

Power (kW)

3.3/2.2

Climbing

image012

Speed (m/min)

0.7

Power (kW)

7.5

Pressure (Mpa)

28

Total power (kW)

40.7 (not include Climbing mechanism motor)

image014(t)

35.66

image014Weight: the weight of underground section without load and ballast with longest jib and maximum free-standing height.

 

How to Operate a Construction Crane

 

A crane operator's day begins with proper safety checks. Failure to do so can result in fatal consequences. Before starting work, the operator must:

1. Make sure they are using the correct crane for the job

Construction cranes are not a one-size-fits-all lifting tool. The features it must have depend entirely on the project that requires the crane. It is not uncommon to see several different types of cranes on the same construction site. While their main purpose is to help move heavy materials and equipment, they can be used for so much more.

 

2. Perform pre-start checks

Ensuring optimal crane operation is a critical step that cannot be ignored. The operator must always check the oil level, seat belts, pressure gauge and battery performance before starting the engine.

For proper communication with the construction team, turn signals, horns, suspension and control systems should be in good working order.

product-780-469

3. Understand construction site procedures

Crane operators are responsible for following certain rules to ensure safety. They can ensure safe lifting by communicating via radio and paying attention to other workers' hand signals to avoid potential hazards. It is critical to keep track of all information provided by control systems.

Mechanics should be proficient in using the joysticks and other controls within the cab to perform all operations correctly. Monitoring load and wind speed is critical.

Hot Tags: building tower crane, China building tower crane manufacturers, suppliers, factory, tower crane emergency project, tower crane invoice, tower crane price, tower crane mast, tower crane safety standard, tower crane control system

Send Inquiry