
Topless Tower Crane
Max. hoisting capacity : 12t
Max. boom length :70 m
Max. hoisting capacity at jib end :2.2t
Max. free standing height : 60m
Description
Technical Parameters
Zhejiang Construction Engineering Machinery Co., Ltd. is one of the most reliable manufacturers and suppliers of topless tower crane in China. With abundant experience, we warmly welcome you to buy advanced topless tower crane made in China here from our factory. Good service and quality products are available.
The topless tower crane ZJT6018 has excellent wind resistance, can be faster erected and dismantled, are more convenient to transport. The processing technical has been upgraded, and the product has a longer service life. Max jib length is 60m, tip load is 1.8t.
Mechanism Specification
|
Hoisting
|
Fall |
|
|
||||||||||
|
Load capacity(t) |
2 |
3.9 |
6 |
6 |
6 |
4 |
7.8 |
12 |
12 |
12 |
|||
|
Speed(m/min) |
91 |
68.3 |
45.5 |
27.3 |
5.5 |
45.5 |
34.2 |
22.8 |
13.7 |
2.8 |
|||
|
Power (kW) |
55 |
||||||||||||
|
Slewing
|
Frequency(Hz) |
6 |
30 |
50 |
|||||||||
|
Speed (r/min) |
0.08 |
0.42 |
0.69 |
||||||||||
|
Power (kW) |
2*7.5 |
||||||||||||
|
Trolleying
|
Speed (m/min) |
0-60 |
|||||||||||
|
Power (kW) |
5.5 |
||||||||||||
|
Climbing
|
Speed (m/min) |
0.6 |
|||||||||||
|
Power (kW) |
7.5 |
||||||||||||
|
Pressure (Mpa) |
28 |
||||||||||||
|
Total power (kW) |
75.5 (not include Climbing mechanism motor) |
||||||||||||
|
|
74.7 |
||||||||||||
Weight: the weight of underground section without load and ballast with longest jib and maximum free-standing height.
The tower crane must operate on the basis of meeting the design requirements.
1. The normal working temperature of the tower crane is -20°C to 50°C, and the wind speed is below level 6 (10.8m/s).
2. When the user first installs the tower crane, the manufacturer sends personnel to the site to guide the installation and follows the prescribed procedures for no-load and rated load, Overload testing and adjustment of various safety devices can only be put into normal use after passing the acceptance of both parties. In the future, every time the construction site is transferred, After the new installation, users should still conduct no-load, rated load, and overload tests and adjust safety devices according to the above procedures, and keep records. Record before proceeding with the assignment.
3. When working at night, in addition to the backup lighting of the tower crane itself, the construction site must be equipped with sufficient lighting equipment.

4. It is prohibited to store lubricating oil, oil cotton yarn, and other flammable and explosive materials in the driver's cab, and attention should be paid to fire prevention.
5. The tower crane must have good electrical grounding measures to prevent lightning strikes. In case of thunderstorms, it is strictly prohibited to walk near the tower body. To ensure personal safety, the tower crane power supply system must be equipped with three-phase four wire leakage and electric shock protectors.
7. Tower cranes should be operated by designated personnel and dedicated personnel.
8. Safety and fire prevention devices (fire extinguishers) must be installed in the driver's cab.
Hot Tags: topless tower crane, China topless tower crane manufacturers, suppliers, factory, crane job site safety, crane warranty certificate, luffing crane, crane broker directory, crane modifications, crane distributor directory
Send Inquiry







